Based on the requirements for remote handling maintenance (RHM) of China Spallation Neutron Source (CSNS) multilayered\npipes, pipes cutting tests were performed under remote handling maintenance conditions. In this study, the results were obtained\nfrom different cutting directions and supporting intensities of pipe baseplates comparisons: When enough power was provided\nand the blade gripper did not slip, the cutting direction had little impact on the cutting capacity but more on the fault surface; the\nclearance between the blades caused the rotating torque; for remote handling maintenance, good horizontal support of the long handled\nlever of the hydraulic cutter was required. Significant conclusions were made for multilayered pipe cutting that are crucial\nfor auxiliary tools development for remote handling maintenance